Product Details
Place of Origin: Wenzhou,China
Brand Name: ZHE HENG
Certification: ISO9001,CE,BV
Model Number: ASTM306L,JIS SUS316L
Payment & Shipping Terms
Minimum Order Quantity: 500 kg
Price: $1000-4200/Ton
Packaging Details: As to clients' requirements,Wooden Cases,Bundle Packin
Delivery Time: 30-45 work days
Payment Terms: L/C, T/T, D/P, D/A
Supply Ability: 1000+
Term Name: |
Stainless Steel Pipe |
Material Grade: |
ASTM306L,JIS SUS316L |
Shape: |
Curved Pipe,Square Pipe,Rectangular Pipe |
Technique: |
Cold Rolled,Pickling |
Length: |
1200mm Or 16000mm |
Size: |
As Per Requirement,O.D 0.3~2.0mm |
Welding Line Type: |
Seamless,Welded |
Package: |
As To Clients' Requirements,Bundle Packing,Wooden Cases |
Term Name: |
Stainless Steel Pipe |
Material Grade: |
ASTM306L,JIS SUS316L |
Shape: |
Curved Pipe,Square Pipe,Rectangular Pipe |
Technique: |
Cold Rolled,Pickling |
Length: |
1200mm Or 16000mm |
Size: |
As Per Requirement,O.D 0.3~2.0mm |
Welding Line Type: |
Seamless,Welded |
Package: |
As To Clients' Requirements,Bundle Packing,Wooden Cases |
Zheheng steel is one incorporate of manufacturer, Exporter ,consultant ,stockist company specialized in the area of stainless steel tubing , pipe fittings ,Flanges and other stainless steel grade accessories .
Overeview:
Hot-rolled seamless steel pipe is divided into general steel pipe, low and medium pressure boiler steel pipe, high pressure boiler steel pipe, alloy steel pipe, stainless steel pipe, petroleum cracking pipe, geological steel pipe and other steel pipes.
In addition to general steel pipe, low and medium pressure boiler steel pipe, high pressure boiler steel pipe, alloy steel pipe, stainless steel pipe, petroleum cracking pipe, other steel pipes, also includes carbon thin-wall steel pipe, alloy thin-wall steel pipe, stainless thin-wall steel pipe, special-shaped steel pipe.
The outer diameter of the hot-rolled seamless pipe is generally greater than 32mm, the wall thickness is 2.5-75mm, the diameter of the cold-rolled seamless steel pipe can be up to 6mm, the wall thickness can be up to 0.25mm, the outer diameter of the thin-walled pipe can be up to 5mm, the wall thickness is less than 0.25mm, and the size accuracy is higher than that of the hot-rolled seamless pipe.
Specification:
Outside Diameter | OD 0.28-1219mm |
Thickness | 0.08-100mm |
Seamless Stainless Steel Pipes | 1/8“NB to 32“NB IN |
Production Process | Cold Drawn,Bright Anneal.etc |
Type | Seamless,welded |
Surface | Pickling,Bright; |
Price Item | EXW,FOB,CNF,CIF etc |
Application |
It is often used as a car frame and exhaust pipe to produce a variety of conventional weapons, gun barrels and shells. |
Ends: | Beveled or plain end, square cut, burr free |
Stainless Steel Seamless Pipe Chemical Component:
Chemical Composition about stainless steel pipe | |||||||
Grade | C ≤ | Si ≤ | Mn ≤ | P ≤ | S ≤ | Ni ≤ | Cr ≤ |
JIS SUS316 | 0.08 | 1 | 2 | 0.045 | 0.03 | 10.00-14.00 | 16.00-18.00 |
JIS SUS316L | 0.035 | 0.75 | 2 | 0.045 | 0.03 | 10.00-15.00 | 16.00-18.00 |
Size table:
Seamless stainless steel pipes
WALL THCKNESS FOR STAINLESS STEEL PIPE &T UBE (ASME B36.10 & B36.19) | |||||||||||||||
DNmm | DNin | φmm | SCH5S | SCH10S | SCH40S | STD | Sch40 | Sch60 | Sch80s | XS | Sch80 | Sch120 | Sch140 | Sch160 | XXS |
6 | 1/8 | 10.3 | 1.24 | 1.73 | 1.73 | 1.73 | 2.41 | 2.41 | 2.41 | ||||||
8 | 1/4 | 13.7 | 1.65 | 2.24 | 2.24 | 2.24 | 3.02 | 3.02 | 3.02 | ||||||
10 | 3/8 | 17.1 | 1.65 | 2.31 | 2.31 | 2.31 | 3.2 | 3.2 | 3.2 | ||||||
15 | 1/2 | 21.3 | 1.65 | 2.11 | 2.77 | 2.77 | 2.77 | 3.73 | 3.73 | 3.73 | 4.78 | 7.47 | |||
20 | 3/4 | 26.7 | 1.65 | 2.11 | 2.87 | 2.87 | 2.87 | 3.91 | 3.91 | 3.91 | 5.56 | 7.82 | |||
25 | 1 | 33.4 | 1.65 | 2.77 | 3.38 | 3.38 | 3.38 | 4.55 | 4.55 | 4.55 | 6.35 | 9.09 | |||
32 | 1 1/4 | 42.2 | 1.65 | 2.77 | 3.56 | 3.56 | 3.56 | 4.85 | 4.85 | 4.85 | 6.35 | 9.7 | |||
40 | 1 1/2 | 48.3 | 1.65 | 2.77 | 3.68 | 3.68 | 3.68 | 5.08 | 5.08 | 5.08 | 7.14 | 10.15 | |||
50 | 2 | 60.3 | 1.65 | 2.77 | 3.91 | 3.91 | 3.91 | 5.54 | 5.54 | 5.54 | 8.74 | 11.07 | |||
65 | 2 1/2 | 76 | 2.11 | 3.05 | 5.16 | 5.16 | 5.16 | 7.01 | 7.01 | 7.01 | 9.53 | 14.02 | |||
80 | 3 | 88.9 | 2.11 | 3.05 | 5.49 | 5.49 | 5.49 | 7.62 | 7.62 | 7.62 | 11.13 | 15.24 | |||
90 | 3 1/2 | 101.6 | 2.11 | 3.05 | 5.74 | 5.74 | 5.74 | 8.08 | 8.08 | 8.08 | |||||
100 | 4 | 114.3 | 2.11 | 3.05 | 6.02 | 6.02 | 6.02 | 8.56 | 8.56 | 8.56 | 11.13 | 13.49 | 17.12 | ||
125 | 5 | 141.3 | 2.77 | 3.4 | 6.55 | 6.55 | 6.55 | 9.53 | 9.53 | 9.53 | 12.7 | 15.88 | 19.05 | ||
150 | 6 | 168.3 | 2.77 | 3.4 | 7.11 | 7.11 | 7.11 | 10.97 | 10.97 | 10.97 | 14.27 | 18.26 | 21.95 | ||
200 | 8 | 219.1 | 2.77 | 3.76 | 8.18 | 8.18 | 8.18 | 10.31 | 12.7 | 12.7 | 12.7 | 18.26 | 20.62 | 23.01 | 22.23 |
250 | 10 | 273 | 3.4 | 4.19 | 9.27 | 9.27 | 9.27 | 12.7 | 12.7 | 12.7 | 15.09 | 21.44 | 25.4 | 28.58 | 25.4 |
300 | 12 | 323.8 | 3.96 | 4.57 | 9.53 | 9.53 | 10.31 | 14.27 | 12.7 | 12.7 | 17.48 | 25.4 | 28.58 | 33.32 | 25.4 |
350 | 14 | 355.6 | 3.96 | 4.78 | 9.53 | 11.13 | 15.09 | 12.7 | 19.05 | 27.79 | 31.75 | 35.71 | |||
400 | 16 | 406.4 | 4.19 | 4.78 | 9.53 | 12.7 | 16.66 | 12.7 | 21.44 | 30.96 | 36.53 | 40.49 | |||
450 | 18 | 457 | 4.19 | 4.78 | 9.53 | 14.27 | 19.05 | 12.7 | 23.83 | 34.93 | 39.67 | 45.24 | |||
500 | 20 | 508 | 4.78 | 5.54 | 9.53 | 15.09 | 20.62 | 12.7 | 26.19 | 38.1 | 44.45 | 50.01 | |||
550 | 22 | 559 | 4.78 | 5.54 | 9.53 | 22.23 | 12.7 | 28.58 | 41.28 | 47.63 | 53.98 | ||||
600 | 24 | 610 | 5.54 | 6.35 | 9.53 | 17.48 | 24.61 | 12.7 | 30.96 | 46.02 | 52.37 | 59.54 | |||
650 | 26 | 660 | 9.53 | 12.7 | |||||||||||
700 | 28 | 711 | 9.53 | 12.7 | |||||||||||
750 | 30 | 762 | 6.35 | 7.92 | 9.53 | 12.7 | |||||||||
800 | 32 | 813 | 9.53 | 17.48 | 12.7 |
Conforms to ANSI B36.19 and ANSI B36.10 standards
FAQ:
Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and trading company. We specialized in special steel which include alloy structural steel and carbon steel and stainless steel, etc. All material are with high quality and competitive price.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as TUV, CE, if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival.
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material don't have stock, the delivery lead time is about 5-30 days after receiving your prepayment or firm order.
Q: What is the payment term?
A: T/T or L/C.
Q: Can you provide a sample for our testing before confirm the order?
A: Yes. We can provide sample to you for approval before you place an order to us. Free sample is available if we have stock.
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.