Send Message
Wenzhou Zheheng Steel Industry Co.,Ltd
products
products
Home > products > Stainless Steel Heat Exchanger Tube > TP304 / S30400 / 1.4301 / X5RCI18-10 Cold Drawn TP304 A269 A213 S30400 1.4301 Heat Exchanger Tube

TP304 / S30400 / 1.4301 / X5RCI18-10 Cold Drawn TP304 A269 A213 S30400 1.4301 Heat Exchanger Tube

Product Details

Place of Origin: CHINA

Brand Name: zheheng

Certification: ISO9001 PED

Model Number: 19mm

Payment & Shipping Terms

Minimum Order Quantity: Negotiable

Price: Negotiable

Packaging Details: as required

Delivery Time: 5-8days

Payment Terms: T/T, L/C

Supply Ability: 1000+

Get Best Price
Highlight: Stainless Steel Boiler Tubes, Metric Stainless Steel Tubing
Material:
TP304 / S30400 / 1.4301 / X5RCI18-10
Type:
Seamless
Trade Terms:
FOB,CNF,CIF
Technique:
Cold Drawn
Certification:
ISO
Standard:
ASTM, AISI, GB, DIN, EN
Transport Package:
Plywood Case
Material:
TP304 / S30400 / 1.4301 / X5RCI18-10
Type:
Seamless
Trade Terms:
FOB,CNF,CIF
Technique:
Cold Drawn
Certification:
ISO
Standard:
ASTM, AISI, GB, DIN, EN
Transport Package:
Plywood Case
TP304 / S30400 / 1.4301 / X5RCI18-10 Cold Drawn TP304 A269 A213 S30400 1.4301 Heat Exchanger Tube
Detailed Product Description
Material: TP304 / S30400 / 1.4301 / X5RCI18-10 Standard: A269 / A213
Type: Seamless Technique: Cold Drawing
Trade Terms: FOB,CNF,CIF Certificates: BV,DNV,NK,LR,ABS
High Light:

stainless steel boiler tubes

,

metric stainless steel tubing

 

 

TP304 / S30400 / 1.4301 / X5RCI18-10 Stainless Steel Heat Exchanger Tube / A269 / A213 standard

 

zheheng steel specializes in producing stainelss steel seamless pipe. We always put the quality as the first consideration. If you're interested in cooperating with our company, welcome to contact me. We will be happy to give you a quotation upon receipt of your detailed requirements.

 

Product Marking
1 In addition to the marking prescribed in Specification A 1016/A 1016M, the marking shall include the condition: hot finished or cold finished.
2 For the austenitic stainless steels having a grain size requirement (see Table 2) the marking shall also include the heat number and heat-treatment lot identification.
3 When either T2 or T12 are ordered with higher sulfur contents as permitted by Note B of Table 1, the marking shall include the letter, S, following the grade designation: T2S or T12S.

 

zheheng steel Chemical assurance

1. Each lot of raw materials will be tested by spectrometer before put in storage.

2. 100%PMI the mother pipe to ensure we put right material.

2. 100%PMI the finished pipe again to ensure we produced right grade


The main products:cold drawn seamless stainless steel,cold drawn seamless stainless steel pipe,cold drawn seamless stainless steel pipes

 

product description in details:

ITEM: TP304 / S30400 / 1.4301 / X5RCI18-10 Stainless Steel Heat Exchanger Tube / A269 / A213 standard
Brand: RONSCO,BAOSTEEL, JISCO, TISCO, etc.
Material: 201.202.301.302.304.304L.310S.316.316L.321.430.430A.309S.2205.2507.2520.430.410.440.904Lect. Or Customized
Standard: GB, AISI, ASTM, ASME, EN, BS, DIN, JIS
Size: ANSI /ASME size is under,other standard of size is for ready choice,O.D.:0.23''to 48''(5.8-1219mm)W.T.:0.04''to 2''(1.0-50.8mm)
Length: Max.18 Meter,NPS 1/8''-48'' Schedule:5/5S,10/10S,20/20S,40/40S,80/80S,120/120S,160/160S according to ANSI B36.19/36.10
Surface: Satin Finish(180#.240#.320#).,Bright Finish(400#,600#,mirror),Mill Finish(2B),Hairline-Finish(HL/Brushed),Ti-gold, Glossy matt,dull and so on.
Application: Decoration, construction and upholstery, etc
Package: Each tube in a plastic bag with size label outside and pack in small bundles or according to customer request
Lead Time: 7-10days for one FCL Or according to order list detail
Payment: A: 100% T/T advance. ( For small order.) B: 30% T/T and balance against copy of documents.
C: 30% T/T advance, balance L/C at sight D: 30% T/T , balance L/C usance
E: 100% L/C usance. F: 100% L/C at sight.
Sample: we could offer the sample for free charge but do not pay the cost of freight.

Heat Treatment Assurance

A full-automatic natural gas furnace with 24 meters in length.The real temperature tolerance could be within 10℃.

 

QUALITY CONTROL

1~ Incoming Raw Material Inspection

2~ Raw Material Segregation to avoid steel grade mix-up

3~ Heating and Hammering End for Cold Drawing

4~ Cold Drawing and Cold Rolling, on line inspection

5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T

6~ Straightening-Cutting to specified length-Finished Measuring Inspection

7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc

8~ Packing and Stocking

ZHEHENG STEEL has passed approved by ABS, DNV, GL, BV, PED 97/23/EC, AD2000-WO, GOST9941-81, CCS, TS, CNNC, ISO9001-2008, ISO 14001-2004 With good quality and competitive price, we warm a good reputation in domestic and international markets. We hope to build a good and long relationship with customers from home and abroad.

 

FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: 100% T/T advance. ( For small order.)
B: 30% T/T and balance against copy of documents.
C: 30% T/T advance, balance L/C at sight
D: 30% T/T , balance L/C usance
E: 100% L/C usance.

 

Product show:

S30400 / 1.4301 Stainless Steel Heat Exchanger Tube  A269 / A213 Standard 0