Send Message
Wenzhou Zheheng Steel Industry Co.,Ltd
products
products
Home > products > Stainless Steel U Tube > 1.2mm Seamless Stainless Steel U Bend Tube For Boiler Heat Exchanger 304 304L

1.2mm Seamless Stainless Steel U Bend Tube For Boiler Heat Exchanger 304 304L

Product Details

Place of Origin: Wenzhou

Brand Name: ZHE HENG

Certification: ISO9001,CE

Model Number: 304,304L,304N,304LM

Payment & Shipping Terms

Minimum Order Quantity: 500 kg

Price: $1000-4200/Ton

Packaging Details: Exportsea worthy packing with each bundle tied and protected, Or as to clients' requirements.

Delivery Time: 30-45 work days

Payment Terms: L/C, T/T, D/P

Supply Ability: 1000+

Get Best Price
Highlight:

Stainless Steel U Tube for Boiler

,

Bend Stainless Steel U Tube 1.2mm

,

Bend 304L Stainless Steel U Tube

Term Name:
Seamless Stainless Steel U Bend Tube
Shape:
Rounde Pipe
Technique:
Cold Rolled,Seamless/Welded
Thickness Tolerance:
1.2mm,1.5mm,2mm
Length:
1000mm-10000mm
Size:
As Per Requirement
Welding Line Type:
Seamless/welded
Packing:
We Can Negotiate,Bundle Packing
Term Name:
Seamless Stainless Steel U Bend Tube
Shape:
Rounde Pipe
Technique:
Cold Rolled,Seamless/Welded
Thickness Tolerance:
1.2mm,1.5mm,2mm
Length:
1000mm-10000mm
Size:
As Per Requirement
Welding Line Type:
Seamless/welded
Packing:
We Can Negotiate,Bundle Packing
1.2mm Seamless Stainless Steel U Bend Tube For Boiler Heat Exchanger 304 304L

Product Description

 

Overview:

Stainless steel shaped pipe is widely used in various structural parts, tools and mechanical parts. Compared with the round tube, stainless steel special-shaped tube generally has a larger moment of inertia and section modulus, has a larger bending and torsional resistance, can greatly reduce the weight of the structure, save steel.
         Stainless steel special-shaped pipe is generally according to the section, the overall shape to distinguish, generally can be divided into: Oval shaped steel pipe, triangular shaped steel pipe, hexagonal shaped steel pipe, diamond shaped steel pipe, stainless steel pattern pipe, stainless steel U-shaped steel pipe, D-shaped pipe, stainless steel bend, S-shaped pipe bend, octagonal shaped steel pipe, semi-circular shaped steel circle, Unequal hexagonal shaped steel pipe, five-valve plum shaped steel pipe, double convex shaped steel pipe, double concave shaped steel pipe, melon shaped shaped steel pipe, conical shaped steel pipe, corrugated shaped steel pipe, etc.

 

Stainless Steel Seamless Pipe Chemical Component

Chemical Composition about stainless steel pipe  
Grade C ≤ Si ≤ Mn ≤ P ≤ S ≤ Ni ≤ Cr ≤
201 0.12 0.75 7.00 0.045 0.045 1.00-1.28 13.70-15.70
202 0.15 1 2.25 0.045 0.045 4.07-4.17 14.00-16.00
304 0.08 0.75 2 0.045 0.03 8.00-11.00 18.00-20.00
304L 0.035 0.75 2 0.045 0.03 8.00-13.00 18.00-20.00
309 0.15 0.75 2 0.045 0.03 12.00-15.00 22.00-24.00
310S 0.08 1.5 2 0.045 0.03 19.00-22.00 24.00-26.00
316 0.08 1 2 0.045 0.03 10.00-14.00 16.00-18.00
316L 0.035 0.75 2 0.045 0.03 10.00-15.00 16.00-18.00
321 0.04-0.10 0.75 2 0.045 0.03 9.00-13.00 17.00-20.00
               

 

 

Size table:

WALL THCKNESS FOR STAINLESS STEEL PIPE &T UBE (ASME B36.10 & B36.19)
DNmm DNin φmm SCH5S SCH10S SCH40S STD Sch40 Sch60 Sch80s XS Sch80 Sch120 Sch140 Sch160 XXS
6 1/8 10.3   1.24 1.73 1.73 1.73   2.41 2.41 2.41        
8 1/4 13.7   1.65 2.24 2.24 2.24   3.02 3.02 3.02        
10 3/8 17.1   1.65 2.31 2.31 2.31   3.2 3.2 3.2        
15 1/2 21.3 1.65 2.11 2.77 2.77 2.77   3.73 3.73 3.73     4.78 7.47
20 3/4 26.7 1.65 2.11 2.87 2.87 2.87   3.91 3.91 3.91     5.56 7.82
25 1 33.4 1.65 2.77 3.38 3.38 3.38   4.55 4.55 4.55     6.35 9.09
32 1 1/4 42.2 1.65 2.77 3.56 3.56 3.56   4.85 4.85 4.85     6.35 9.7
40 1 1/2 48.3 1.65 2.77 3.68 3.68 3.68   5.08 5.08 5.08     7.14 10.15
50 2 60.3 1.65 2.77 3.91 3.91 3.91   5.54 5.54 5.54     8.74 11.07
65 2 1/2 76 2.11 3.05 5.16 5.16 5.16   7.01 7.01 7.01     9.53 14.02
80 3 88.9 2.11 3.05 5.49 5.49 5.49   7.62 7.62 7.62     11.13 15.24
90 3 1/2 101.6 2.11 3.05 5.74 5.74 5.74   8.08 8.08 8.08        
100 4 114.3 2.11 3.05 6.02 6.02 6.02   8.56 8.56 8.56 11.13   13.49 17.12
125 5 141.3 2.77 3.4 6.55 6.55 6.55   9.53 9.53 9.53 12.7   15.88 19.05
150 6 168.3 2.77 3.4 7.11 7.11 7.11   10.97 10.97 10.97 14.27   18.26 21.95
200 8 219.1 2.77 3.76 8.18 8.18 8.18 10.31 12.7 12.7 12.7 18.26 20.62 23.01 22.23
250 10 273 3.4 4.19 9.27 9.27 9.27 12.7 12.7 12.7 15.09 21.44 25.4 28.58 25.4
300 12 323.8 3.96 4.57 9.53 9.53 10.31 14.27 12.7 12.7 17.48 25.4 28.58 33.32 25.4
350 14 355.6 3.96 4.78   9.53 11.13 15.09   12.7 19.05 27.79 31.75 35.71  
400 16 406.4 4.19 4.78   9.53 12.7 16.66   12.7 21.44 30.96 36.53 40.49  
450 18 457 4.19 4.78   9.53 14.27 19.05   12.7 23.83 34.93 39.67 45.24  
500 20 508 4.78 5.54   9.53 15.09 20.62   12.7 26.19 38.1 44.45 50.01  
550 22 559 4.78 5.54   9.53   22.23   12.7 28.58 41.28 47.63 53.98  
600 24 610 5.54 6.35   9.53 17.48 24.61   12.7 30.96 46.02 52.37 59.54  
650 26 660       9.53       12.7          
700 28 711       9.53       12.7          
750 30 762 6.35 7.92   9.53       12.7          
800 32 813       9.53 17.48     12.7          
                               

 

 

1.2mm Seamless Stainless Steel U Bend Tube For Boiler Heat Exchanger 304 304L 0

 

1.2mm Seamless Stainless Steel U Bend Tube For Boiler Heat Exchanger 304 304L 1

 

 

FAQ:
Q: Are you a manufacturer or merely a trader?
A: We are group of companies and owned manufacturer bases and trading company. We specialized in special steel which include alloy structural steel and carbon steel and stainless steel, etc. All material are with high quality and competitive price.
Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as TUV, CE, if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival.
Q: Delivery time?
A: We have ready stock for most of material grades in our warehouse. If the material don't have stock, the delivery lead time is about 5-30 days after receiving your prepayment or firm order.
Q: What is the payment term?
A: T/T or L/C.
Q: Can you provide a sample for our testing before confirm the order?
A: Yes. We can provide sample to you for approval before you place an order to us. Free sample is available if we have stock.
Q: Can we visit your company and factory?
A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.